“No-pigment” Matte Lacquer (Varnish)

“No-pigment” Matte Lacquer (Varnish)

REF : 6022
Price range: 46,60 € through 113,59 €
Transparent interior varnish for wood and metal, providing a matte finish. Good to know: Its composition, rich in plant oil, makes Galtane “no-pigment” lacquer more fluid than conventional varnishes.

In stock

Pack size
Choose an option▾
  • 750 ml
  • 2.5 L
clear

Technical Advantages & Composition

  • Diisocyanate-free formulation: Galtane products are formulated without diisocyanates, which are synthetic chemical compounds often used as drying accelerators.

  • Natural drying: The absence of synthetic accelerating agents accounts for the classic and progressive drying time of our wood stains, oils, and lacquers.

  • Application comfort: Allows you to apply the product without exposure to fumes from isocyanate reagents.

Additional details

Good to know

Two coats are sufficient. Note: To protect your health, we do not recommend the use of isocyanate (a drying accelerator) or the anti-skin agent butanone oxime; therefore, we advise removing any skin that may form on the lacquer. If necessary, filter the lacquer (using a nylon stocking, strainer, etc.) before application. Let oil-soaked rags dry flat in a well-ventilated area: risk of spontaneous combustion. Stir the product thoroughly with a mixing stick before use.

Tools

  • Cutting-in brush
  • Lacquer roller
  • Plant-based solvent

Good to Know

  • The drying time for an oil painting will depend on the temperature and on the humidity of the air and of the surface. The drying time for the first coat at 20°C and 60% relative humidity in the air will be from 24 to 48 hours for the first coat. 3 to 5 days for the second coat.
  • Cool and humid conditions will increase drying times.
  • Despite the long drying times, it will be important to observe the drying drying time for the first coat before applying the second one.
  • A delay in drying time on tannic woods (oak, chestnut, etc.) will be observed. It will take 4 to 6 days for the first coat.

Technical specifications

Coverage

14 m²/l

Coats

2

Drying time

24h – 48h – 72h at 20°C

Pack size

750 ml, 2.5 L

Any questions?

Your Shopping cart

Close